Meet Inspiring Speakers and Experts at our 3000+ Global Conference Series Events with over 1000+ Conferences, 1000+ Symposiums
and 1000+ Workshops on Medical, Pharma, Engineering, Science, Technology and Business.

Explore and learn more about Conference Series : World's leading Event Organizer

Back

Ibrahim Zeid

Ibrahim Zeid

Hammoud Hospital University Medical center, Lebanon

Title: Using lean six sigma approach to reduce central line associated bloodstream infections in Hammoud hospital university medical center

Biography

Biography: Ibrahim Zeid

Abstract

Statement of the Problem: CLABSIs are considered important problem among ICU patients as they are significantly associated with increased mortality and morbidity, increased hospitalization, and higher cost. During the calendar 2014, the CLABSI rates for medical surgical ICU patients were 3.25 per 1000 catheter days. Our goal was ZERO CLABSIs. The purpose of this study is to use the Lean Six Sigma process to reduce CLABSIs in adult ICU. Methodology & Theoretical Orientation: A multidisciplinary team of nurses, infection control officer, quality manager, residents and nurse educator utilized the Lean Six Sigma process improvement plan model to study the root causes and solutions to prevent CLABSIs, plan process improvements and to develop a plan for maintaining improvement over time. A retrospective chart review of all 2014 CLABSIs was conducted to identify infecting organisms, type of catheter, insertion site location and number days between insertion and infection. Registered nurses were interviewed to assess their understanding level of CLABSI prevention policy and asked for ideas about the causes of CLABSIS and what they could do to prevent these infections. Observations were made to evaluate compliance with central line insertion and maintenance Bundle. Findings: Lack of compliance with CL insertion policy by Hospital Residents was identified. Prior to the project, the CLABSI rate for adult medical ICU was 3.25 per 1000 catheter days. After launching the project, we achieved 0 rates. Compliance rate with central line insertion bundle was increased from 71% to 89%. Compliance rate with central line maintenance bundle was increased from insertion from 79% to 97%.
Lesson learned:
1. Lean Six sigma allowed in depth examination of potential causes and solution to prevent CLABSIs.
2. To improve patient safety by eliminating life-threatening errors.